King Edward Girls School

Work Undertaken

Complete decoration to all area total length of contract six weeks

Specialised decoration

Hand painted detail

Walsall Adult Community College

Work Undertaken

Refurb to form reception area out of two classrooms and modernise kitchen

Complete strip out, doors, floors, walls ceiling tiles and all electrics

New layout for kitchen and reception area

The Kitchen

Block up doorway and plaster

New electric ring main for new cookers

New cookers, sinks, extractors

The Reception Area

Latex floors

New flooring

Remove front of new reception area and fit new PVC double glassed walling with sensor operated doors

New disabled ramp with handrail

Suspended ceiling with LED 600×600 lights

Roller door to kitchen area

Decoration to all areas

Further Images of our Work at Walsall Community College

St Marys School

Create a New Office

New roof with insulation

New timber floor

New door opening with lintel door frame and door

Dab and dot plasterboard wall

New lighting and socket ring main

New radiator connected from the main office

Laminate flooring

Decoration to all areas

Turn Unused Classroom into a Fully Independent Training Area

Works carried out

Replaced all insulation and external cladding

Repair rafters and floor were rotten

Repair leaks in roof

New lighting, sockets, heaters and fuse board

New toilet cubicles, toilets and hand basin

New kitchen units, sink and taps

Radiator covers

New laminate flooring

Decoration to all areas

UPVC Replacement

New roof with insulation

New timber floor

New door opening with lintel door frame and door

Dab and dot plasterboard wall

New lighting and socket ring main

New radiator connected from the main office

Laminate flooring

Decoration to all areas

Outside Work

Prime undercoat and gloss railings in red yellow blue and green

Further Images of our Work at St Mary’s

Hillcrest Secondary School

Work Undertaken

Complete strip out, doors, floor wall tiles Ceiling

New layout for showers and stores

New door opening with lintel door frame and door

New partition walls

New suspended ceiling

New lighting and socket ring main

Latex floors and fit polysafe to floor

Decoration to all areas

New fire alarm

New doors and closers

New showers and wet walling

New designed and built changing room benches by W. Barratt Contractors Ltd

Further Images of our Work Here

Robin Hood School

Roof Repair Work Undertaken

Renewed floor

Constructed male and female toilets

Installed new electrics throughout

Installed new gas supply

Built new industrial kitchen

Applied new flooring throughout

Further Images of our Work at Robin Hood School

St Peter Caretakers Bungalow

Repair Work Undertaken

Landscaping laying slabs

New disabled toilet hand rails

Dab and dot plasterboard wall

New lighting and socket ring main

New radiators

Apply laminate and carpet tiles to flooring

Internal and external decoration to all areas

Further Images of our Work at St Peter Caretakers Bungalow

St Michaels School

Outside Work

Prime undercoat and gloss railings in red yellow blue and green